{"id":86668,"date":"2021-06-21T10:27:07","date_gmt":"2021-06-21T14:27:07","guid":{"rendered":"https:\/\/formationconstruction.com\/uncategorized\/15-1-hot-air-heating-systems\/"},"modified":"2023-08-22T13:47:55","modified_gmt":"2023-08-22T18:47:55","slug":"15-1-hot-air-heating-systems","status":"publish","type":"post","link":"https:\/\/formationconstruction.com\/en\/rbq-licenses\/licenses\/15-1-hot-air-heating-systems\/","title":{"rendered":"15.1 Pulsed air heating systems"},"content":{"rendered":"

Subclass 15.1<\/h1>\n

This subclass authorizes construction work which is reserved exclusively for master pipe-mechanics under the Act respecting master pipe-mechanics (CQLR, c. M-4) and which concerns forced-air heating systems.<\/p>\n

It also authorizes construction work which is not already authorized by the first paragraph and which concerns forced air heating systems, in particular those relating to propane burner systems and those included in subclass 15.1.1.<\/p>\n

In addition, this subclass authorizes construction work relating to forced air systems for heating and air conditioning. However, work relating to heating and air conditioning devices forming part of such systems can only be carried out on condition that the contractor also holds the appropriate subclass 15.9 or 15.10.<\/p>\n

Finally, it authorizes related construction work.<\/p>\n

Additional explanations<\/h2>\n

This subclass includes construction work in subclass 15.1.1.<\/p>\n

This subclass, without going beyond the regulatory framework<\/strong> , authorizes in particular construction work relating to:<\/p>\n