{"id":86678,"date":"2021-06-21T10:29:23","date_gmt":"2021-06-21T14:29:23","guid":{"rendered":"https:\/\/formationconstruction.com\/uncategorized\/15-2-1-natural-gas-burner-systems-for-certain-work-that-is-not-reserved-exclusively-for-master-pipe-mechanics\/"},"modified":"2023-08-22T13:53:58","modified_gmt":"2023-08-22T18:53:58","slug":"15-2-1-natural-gas-burner-systems-for-certain-work-that-is-not-reserved-exclusively-for-master-pipe-mechanics","status":"publish","type":"post","link":"https:\/\/formationconstruction.com\/en\/rbq-licenses\/licenses\/15-2-1-natural-gas-burner-systems-for-certain-work-that-is-not-reserved-exclusively-for-master-pipe-mechanics\/","title":{"rendered":"15.2.1 Natural gas burner systems for certain work that is not reserved exclusively for master pipe-mechanics"},"content":{"rendered":"

Subclass 15.2.1<\/h1>\n

This subclass authorizes maintenance work on natural gas combustion systems.<\/p>\n

It also authorizes construction work relating to natural gas combustion systems that are carried out on the territory of a local municipality whose population does not exceed 5,000 inhabitants, except if a public sewer is there, or on a unorganized territory.<\/p>\n

Finally, it authorizes related construction work.<\/p>\n

Additional explanations<\/h2>\n

This subclass is fully included in subclass 15.2.<\/p>\n

This subclass includes in particular construction work relating to:<\/p>\n