{"id":86690,"date":"2021-06-21T10:29:31","date_gmt":"2021-06-21T14:29:31","guid":{"rendered":"https:\/\/formationconstruction.com\/uncategorized\/15-10-refrigeration\/"},"modified":"2022-12-22T14:41:01","modified_gmt":"2022-12-22T18:41:01","slug":"15-10-refrigeration","status":"publish","type":"post","link":"https:\/\/formationconstruction.com\/en\/rbq-licenses\/licenses\/15-10-refrigeration\/","title":{"rendered":"15.10 Refrigeration"},"content":{"rendered":"
This sub-category authorizes construction work which is not reserved exclusively for master pipe-mechanics and which concerns any refrigeration system, in particular those relating to air conditioning, industrial processes and product conservation.<\/p>\n
It also authorizes construction work on devices allowing the heating and air conditioning of a forced air system on condition that the contractor also holds the appropriate subclass 15.1, 15.1.1, 15.7 or 15.8.<\/p>\n
In addition, this subclass authorizes construction work on devices allowing the heating and air conditioning of a hydronic system on condition that the contractor also holds the appropriate subclass 15.4 or 15.4.1.<\/p>\n
Finally, it authorizes similar or related construction work.<\/p>\n
This subcategory includes construction work in subcategory 15.9.<\/p>\n
This subcategory, without going beyond the regulatory framework<\/strong> , authorizes in particular construction work relating to:<\/p>\n Please note that work relating to air distribution falls under either sub-category 15.7 or sub-category 15.8. Entrepreneurs holding the sub-category 15.1<\/u> or 15.1.1<\/u> may also perform work relating to the air distribution network when the latter is part of a heating system.<\/p>\n Construction work on an electrical installation is reserved exclusively for contractors or owner-builders with subcategory 16.0.<\/p>\n No license is required for monitoring, inspection, testing and verification work.<\/p>\n Source: www.rbq.gouv.qc.ca\/en<\/a><\/p><\/blockquote>\n Subcategory 15.10 This sub-category authorizes construction work which is not reserved exclusively for master pipe-mechanics and which concerns any refrigeration system, in particular those relating to air conditioning, industrial processes and product conservation. It also authorizes construction work on devices allowing the heating and air conditioning of a forced air system on condition that the contractor also holds the appropriate …<\/p>\n","protected":false},"author":1,"featured_media":80588,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_vibebp_attr":"","_vibebp_dimensions":"","_vibebp_responsive_height":"","_vibebp_accordion_ie_support":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0},"categories":[231],"tags":[437],"aioseo_notices":[],"aioseo_head":"\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n
Work that does not require a license<\/h2>\n
Examinations to take:<\/h2>\n
\n
<\/i> Make a new search<\/a><\/h2>\n","protected":false},"excerpt":{"rendered":"