1.4 Road and main contractor
Subclass 1.4 This subclass authorizes construction work relating to roads and public thoroughfares, sewers, aqueducts, pipelines, railway works and tunnels. It also authorizes construction work included in subclasses 3.1, 4.1, 5.1 and 6.1 of Annex II, when it concerns a civil engineering work referred to in this subclass. In addition, this subclass authorizes construction work included in subclass 1.6, but …
Read More7. Insulating, waterproofing, roofing and siding
Subclass 7.0 This subclass authorizes construction work relating to fireproofing, waterproofing, insulation, thermal insulation, roofing, exterior wall covering other than masonry, as well as similar or related construction work. Additional explanations fire collars to ensure the required degree of fire resistance (does not include fire dampers, doors or registers); the removal of asbestos or any other flame retardant; waterproofing and …
Read More15.3.1 Oil burner systems for certain work which is not reserved exclusively for master pipe-mechanics
Subclass 15.3.1 This subclass authorizes maintenance work on oil combustion systems. It also authorizes construction work relating to oil combustion systems and which is carried out on the territory of a local municipality whose population does not exceed 5,000 inhabitants, unless there is a public sewer there, or in an unorganized territory. Finally, it authorizes related construction work. Additional explanations …
Read More4.2 Non-structural masonry, marble and ceramics
Subclass 4.2 This subclass authorizes construction work that involves non-structural masonry, marble, granite, ceramics, terrazzo and other similar materials, refractory products as well as similar or related construction work. Additional explanations This subclass is fully included in subclass 4.1. This subclass includes in particular construction work relating to: the installation of brick facing without mortar such as “Novabrik”; refractory products …
Read More2.7 Sitework
Subclass 2.7 This subclass authorizes construction work relating to the preparation and finishing of sites, such as alignment, leveling, fencing, demolition, paving and asphalting, interlocking paving stones as well as construction work. similar or related. Additional explanations This subclass includes in particular construction work relating to: the stripping of buildings of all kinds, civil engineering works and equipment intended for …
Read More15.9 Small refrigeration systems
Subclass 15.9 This subclass authorizes construction work which is not reserved exclusively for master pipe-mechanics and which concerns refrigeration systems for air conditioning purposes, the cooling capacity of which does not exceed 20 kW and which uses a refrigerant classified in group A1 , A2 or a mixture thereof, according to the classification provided in the table on the classification …
Read More