Subclass 15.1.1
This subclass authorizes maintenance work on forced air heating systems, including propane burner systems that form part of it.
It also authorizes construction work relating to the heating systems referred to in the first paragraph that are carried out on the territory of a local municipality whose population does not exceed 5,000 inhabitants, unless a public sewer is there, or on a unorganized territory.
In addition, this subclass authorizes construction work relating to forced air systems for heating and air conditioning that are carried out in the territories referred to in the second paragraph. However, work relating to heating and air conditioning devices forming part of such systems can only be carried out on condition that the contractor also holds the appropriate subclass 15.9 or 15.10.
Finally, it authorizes related construction work.
Additional explanations
This subclass is fully included in subclass 15.1.
This subclass, without going beyond the regulatory framework , authorizes in particular construction work relating to the maintenance and demolition of forced-air heating systems.
In addition, when the work is carried out in the territories mentioned above (municipality without public sewer with less than 5,000 inhabitants, or an unorganized territory), it authorizes in particular the construction work relating to:
- when installing the heater
- when installing or replacing the burner
- the installation of the gas supply piping and the connection to the meter or the cylinder and the connection to the burner
- the installation of the fuel oil supply piping, the tank and the connection to the tank as well as to the burner
- installing wall vents
- to the chimney connection
- connection and installation of prefabricated chimneys
- the installation of a liner inside the chimney casings
- the installation of control systems and the regulation of forced air systems for heating
- maintenance and demolition of forced air heating systems
- installation of the air distribution network
- when installing the HRV when it is part of the forced air heating system.
Additional details
Please note that this subclass does not include similar work.
Construction work for a propane burner system (not part of a forced air heating system) requires subclass 15.6.
The contractor who carries out construction work relating to a device which heats and air conditioners must also have the refrigeration subclass (15.9 or 15.10) relevant to the work.
Construction work on an electrical installation is reserved exclusively for contractors or owner-builders holding subclass 16.0.
To check whether the municipality has a public sewer or not, and to find out if the population exceeds 5,000 inhabitants, check with the Ministry of Municipal Affairs and Land Occupancy.
For any questions concerning the interpretation of the Act respecting master pipe-mechanics (CQLR, c. M-4) and the exclusivity of the work to its members, contact the Corporation of master pipe-mechanics of Quebec (CMMTQ ). The latter has been responsible for qualifying its members since November 19, 2001.
CMMTQ
Qualification service
Phone. : 514 382-2668
1 800 465-2668
Website : www.cmmtq.org (LINK IN FRENCH)
Email Address : [email protected]
Source: www.rbq.gouv.qc.ca/en
The qualification of contractors for this subclass is the responsibility of the Corporation of Master Pipe-Mechanics of Quebec ( CMMTQ ).
Examinations to take:
- Administration, Management and Management
- Safety management on construction sites
- Project and Site Management
- Execution of construction works – 15.1.1
0 responses on "15.1.1 Pulsed air heating systems for certain work that is not reserved exclusively for master pipe-mechanics"